MEPCO New Connection 2023 – Detailed Method And Cost

MEPCO New Connection 2022 detailed information is compiled here Multan region of customers knows better that MEPCO is the most incredible power organization in Punjab. Since it has numerous customers, it chiefly covers southern Punjab with numerous little towns. So this electric give organization gives electricity to each humble community.

Before, individuals need to introduce another association. For accommodation and application for the establishment, they visit the provincial workplaces. In any case, presently a day everybody can apply online which is liberated from cost.

MEPCO New Connection Procedure

On the off chance that you are a Multan Electric Power Organization (Mepco) client and need to introduce a meter click on the above button that diverts a site page where you might Mepco Online at any point apply for another connection.Where you can fill the internet-based structure with the accompanying data.

You can send the application to MEPCO concerned office or by enrolling an Email. From that point onward, you will get a receipt and a chronic number as a certification to the candidate for the following system or reference given by the MEPCO office. If you live in Faisalabad and want to download an online E bill read the step-by-step detail in FESCO Online Bill to download it.

Take clear pictures, and scan all the documents that are listed below:

  • Copy Of Property Document
  • An Agreement of Rent if Property not Owned by you
  • An Application Undertaking Form
  • CNIC Copy of Applicant (Attested)
  • CNIC Copy of Witness (Attested)
  • Neighbor Electricity Bill Copy

After that, you need to follow these steps for MEPCO new connection.

  • Presently gather every one of the reports, orchestrate them and visit your closest office.
  • Present every one of the gathered reports there.
  • The confirmation interaction might take some time so you’ve to sit tight for a little there at the workplace.
  • After the confirmation interaction has been finished, an interesting notice will be given.
  • Presently you’ve to circle back to it and gather the slip alongside the recorded sum.
  • Present this add-up to the closest bank and take the installment slip from the bank.
  • Present the installment slip to a similar office.
  • When all that will be finished, the meter establishment interaction will be begun.
  • You should be receptive to the calls you’ll get for the meter establishment against the area for which you’ve applied for the new association.

Don’t Forget to Check: MEPCO Net Metering

How to Apply for New Connection Offline Procedure?

If you are a consumer of MEPCO and want to apply for a new connection offline procedure follow these instructions.

  • You, most importantly, need to visit the closest office of the dissemination organization. Then, at that point, you want to request the application structure for another association. There might be a unique counter for something similar. Gather the application structure from that point.
  • Fill the form similarly as we have talked about above in the event of filling it on the web.
  • Before presenting the structure to the workplace, you really want to append the important archives with the structure. You want to append the duplicates of these records.
  • At long last, you need to present the filled structure with all connections. At the point when you present the application, you need to pay the application expense. Should gather the receipt of the application. Presently individuals from the power office will check the premises. In the case of all is great, then they will support your application. And afterward, they will introduce a meter to your premises; presently, you can utilize power.

Why Opt Mepco New Connection Online?

Subsequent to presenting the Mepco online meter application, you ought to search for strategies to really look at Mepco online application status. There are various ways of searching for Mepco application status. The most well-known strategy broadly utilized is calling the help community. Let them know the public personality card number, and they will illuminate you about your application status.

The other technique is checking the new application status on the web. At the point when a candidate applies for the new association, they are given the following ID subsequent to filling and presenting the structure. The following id is extraordinary for each new application.

The tracking id isn’t the best way to follow the situation with the new association, yet a candidate can likewise utilize their CNIC number as the following id. Whenever neglected to take note of the following id subsequent to applying, you can constantly utilize your CNIC number to follow it. Simply enter the CNIC number in the case requiring CNIC or the following id; you will be shown the application status alongside the following id for the new association.

  • Are you worried about your extra consumption of electricity bills and looking for methods to save energy? To save your electricity click on MEPCO Energy Saving Tips. Here we will get new and easy methods to save money.

Mepco New Connection Fee

MEPCO new association expense for a private association is Rs.5000 according to the new fuel charges by Wapda. The new charges are higher because of the new expense arrangements and extra charges. The charges are different relying upon the association the purchaser is getting. The charges likewise fluctuate contingent upon the helpline length, and furthermore consistently, the power supply organizations update the charges a customer needs to pay for the new association.

MEPCO Demand Notice Tracking

MEPCO (Multan Electric Power Organization) has made many simple administrations that assist with outing clients. One of the high-level administrations that mepco gives MEPCO New Association Following. Presently you can follow your new association application online by sitting at your home. We will give you every one of the guidelines you ought to keep as given beneath by following the advances you can follow in your new association following.

  • Open authority site of MEPCO.
  • An application following page will be opened.
  • Select a new association choice.
  • Then, at that point, a select organization is IESCO.
  • Then, at that point, add your Following Id or CNIC.
  • Your Followed Application will be opened.

Mepco Tariff

Tariffs are the expenses, costs, rates, terms, and conditions that oversee the age, transmission, interconnection, conveyance, and offer of electric capacity to buyers by a MEPCO. MEPCO can charge purchasers for duty designs that have been endorsed by NEPRA and have been declared by the Pakistani government.

Per Unit Price

1-50 Units                          3.95

1 – 100 Units                       7.74

101 – 200 Units                   10.06

201 – 300 Units                    12.15

301 – 700                              19.55

More than 700 Units  22.65

Leave a Comment